This part of the process has really gone quickly.  Despite some inclement weather the concrete guys were able to get our foundation walls poured and the forms stripped in about two days.  No real surprises here.  Concrete looks good except in a few places where the aggregate is showing through.  We'll talk to Ryan about getting them patched as they're in locations that will be noticeable from the outside.

Looking from front to back of garage
The Bateman has a 3-car tandem garage which means one side is two cars deep.  You can see the third spot in the back on the right.

Looking from garage to the front door
The layout looks small in these pictures but the basement is huge.  The boys want a big area to practice inline hockey.

Back of the house
We wanted our walkout door to be below the morning room door and Ryan accommodated that request without any hesitation.  The entire back wall will be covered by a deck.  We're looking into an under-deck drainage system so we can use the future patio when it's raining outside.